TL;DR: Ship value faster by standardizing developer golden paths on an Internal Developer Platform (IDP). Start with three paths (API, data, frontend), measure time to first deploy, and track MTTR and cost/feature. This post lays out a reference architecture, adoption playbook, and a 6‑week bootstrap.

Why IDP now

Minimum Viable Platform (6 capabilities)

  1. CI (build, test)
  2. CD (progressive delivery, approvals)
  3. IaC (standard stacks, secure by default)
  4. Runtime (Kubernetes/serverless with templates)
  5. Observability (logs, metrics, traces, SLOs)
  6. Developer Portal (Backstage-like catalog)

Golden Paths (start with three)

Metric to watch: Time to first deploy (TTFD). Push for minutes, not days.

Cost‑to‑Serve & FinOps guardrails

Adoption Playbook (make Platform a product)

6‑Week Bootstrap (what I run)


Loom (≤5 min) — Script

CTA: If you want a 6‑week IDP bootstrap with measurable ROI, I can help design and land it.